Artificial turf construction process in detail |
Artificial turf construction process in detail
News Source:Wuxi Leisutan Artificial Turf Co.,Ltd -
(1) Coating: Demand exterior paint with a brush in his uniform thickness, no repeat gluing, or will render sparkling appearance, or even decline. Base fabric coated with glue, and strictly control the thickness of the glue, pay attention to the proper speed glue, glue should leave adhesive applied to both surfaces to be bonded.
(2) adhesion: the time based on temperature, humidity, barometric pressure and other conditions of the real impact of the show, set reasonable control of air time. After the glue is usually within 10-30 minutes to reach eight or nine mortar dry to the touch stick into appropriate. When aligned with the needs of disposable adhesive cement. No later cut back the adhesive bonding of the object to be moved.
(3) pressure: After a good adhesion to eradicate its exterior debris, with a special force from the adhesion of the rubber mallet to hammer two real, it looks plenty touch dense, stronger bonding.
(4) curing: curing time is usually three days, testing the strength is usually the end of ten days. Thus, the need to pay close attention to its curing time protection against excessive exposure, flooding and move to reach optimum bonding conditions.
(5) Before After bonding without quartz sand and rubber granules sprinkled on the premises turf cutting debris cleaned disposal.