Natural - artificial turf mixed
News Source:Wuxi Leisutan Artificial Turf Co.,Ltd -
The natural grass and artificial turf together is not a dream, now have such a mixed lawn, this is a natural grass lawn with plastic grass root structure to be reinforced, for example, let the grass made in plastic mesh like growth on the bottom. In this way, the natural turf for user-friendly features and superior durability of artificial turf a good combination. Artificial turf filler particles in the country accounted for 95%, but many schools in the choice of products is often easy to overlook when the most important aspects of construction, construction technology of artificial grass artificial turf late in the maintenance and increase the life is very important. First of all to make technical preparations, make "leveling" and be familiar with the drawings, inspection and acceptance of construction quality foundation laying sites to be cleaned, the surface should be dry, smooth, no debris, no wax stains, grease, the minimum application temperature should be maintained at above 10 ℃. Using theodolite or other instruments to measure the size of the surrounding facilities meets the playground, the Department should immediately if any improper modification, tolerance of ± 5 mm. Secondly, to be laid before the artificial grass and artificial turf grass production units together for quality check on the quality of the turf material, density, and weaving is qualified to meet the requirements. A standard site can not be more than 30 connections, while the quality check whether the filler to meet environmental requirements. In laying process, to use special tools according to specifications on the lawn trimming, butt, lap lawn will be cut flush. The use of artificial grass sports venues glue connections, joints should be no greater than 2 mm. When the bonding temperature is not too low, the ambient temperature is above 10 ℃ should choose appropriate construction; Also not Meiyu weather rain or under construction, otherwise it will lead to long time or even cause the adhesive stick. Quartz sand, filled rubber particles is the construction process is the most important aspect, only artificial turf surface materials to be installed, after formation of a solid compliance check before filling quartz sand and rubber granules. Filling quantity and specifications are determined according to the height and density of grass. Note that you must use a dedicated machine and brush grass sand injection equipment to fill the particles, we can ensure flatness and uniformity of the venue, while beneficial to improve athletic performance venues. And quartz sand and rubber granules must be completely dry before construction materials, otherwise the stem will be filled with an overwhelming affect quality. Quartz sand should take multi-filling, each filled with a layer of grass are required to use the brush to brush back and forth so that the filler Shop whereabouts enriched. Usually a venue to play more laid back and forth twenty times better.