1, first check the flatness and surface slope, contrast material inspection and acceptance by the construction unit complete information. Construction projects, and submitted to the owners. According to project the amount of material to ensure project quality and limitations of time. Clean up the site, the site needs to be cleaned laying lawn, cleaning up the oil, debris, dirt and other debris. Sites should be kept clean surroundings, garbage is prohibited. We must clean up the joints, fill out new material.
2, secondly, the laying of a single layer underlying the fabric attendant arrangement, between each of the non-woven suture must be complete. Non-woven fabric must be laid flat bottom, there is no appearance of wrinkles.
3, the artificial turf to the construction site, is calculated according to the drawings. Were laying on the lawn, smooth, seam cutting special tools, grass seedlings direction must be consistent, otherwise prone to visual color. Using special waterproof glue and adhesives, joint After connecting the lawn, waiting for the glue to generate cohesion and compaction. Should check whether the flat and firm after laying glue. According to the labeling requirements linked drawing surface, and checks can fill sand and rubber particles. You can choose a floating or full bars the way, if the grass is coated PU (polyurethane), you'd use the latter. Joint first put fabric, the fabric should not pay attention to stay on the ground, and then use a toothed spatula, scraping gum, and then close on the grass on both sides. After turf paving translates to approximately 15-25 mm of turfgrass back prevention drainage holes stability can not be used as a sand blocked faster displacement. About 20-25 mm 1 mm under a process full of (large) or colored EPDM granules (which can reduce the surface temperature) of recycled plastic particles. Note that after the filling of sand and rubber particles retain 10-12 cm grass wire exposed.
4, the rubber particles and quartz sand specifications, rubber particles, 0.5 2 mm, standard dosage for 5-6 KG / M2 (30-40 mm grass) quartz sand: 0.2-0.8 mm size, the amount of 18 to 20 KG / M2 , (30-40 mm grass)
5, the acceptance criteria, after the laying of artificial turf sand filling production line, it should be accurate. Floors should be smooth, no significant difference. Lawn seams should be firm, smooth filling.
6, one to three months after the completion of the construction period, during normal movement, rain, temperature changes and the presence of other factors, the nature of the surface leakage of grass cover, creating a compact surface without bias, and fillers, drainage performance will gradually appear, in uniformity should fill material and thickness during this period to conduct an inspection, adjustment, due to increase or decrease the flatness of every two weeks. According to site-specific circumstances reasonable construction scheme selection is the most reasonable construction plan, only a scientific and rational implanted artificial turf, it will be good for everyone to show its green beauty.