According to the basic requirements for the use of the site after its foundation to meet the requirements for cement concrete foundation or 10% of cement powder base layer through conservation, then laying of artificial turf, the main construction program are as follows:
1. Check the entire lawn space, based on the density and flatness is to meet the requirements, you can begin paving after reaching the artificial turf.
2. Surveying the entire site, the measurement position and mark the pitch line, marked with different colors of ink is good, good position to determine the direction and laying artificial turf.
3, began laying artificial turf: pavement joints on the lawn at the splicing tape and secured thereto with nails, nail head not raised, joining more than 10 cm overlap zone transfer needs.
4, at the joint interface coated with glue, glue prior to drying, the tile cut lawn and good bonding, so that the close adhesion between each piece of artificial turf.
5, after laying is completed, need to carefully check the adhesive bonding area is smooth, artificial grass is firmly bonded, after checking all meet the requirements, before proceeding to the next step of the construction.
6, in the need to insert into the white line positions cut green lawns, set in connection with, and put glue on top, and then cut a good white artificial grass pitches line inlaid into the pavement in front of the stadium marked a good line position belt splicing bonding.
7, according to the needs of the site and sprinkled with quartz sand particles. If you need to put the spilled quartz sand or quartz sand particles sprinkled into the granulator, granulator can be carried out to promote the spill or colloidal silica sand filled artificial turf surface, sprinkle granulator back brush flat quartz sand or black rubber , and quartz sand or black rubber whereabouts sufficient.
8, pushing sprinkle granulator speed should be uniform, not too fast nor too slow, even to thickness.
9, after the laying of quartz sand or particles need to check whether the formation and adequate, inadequate office is required to consider to fill, pavement requiring immediate removal of any impurities found in order to ensure quality.
10, paving the quartz sand or particles need to keep dry, in order to facilitate the flow of particles of quartz sand or pavement. After completion of the quartz sand or rubber pavement can also use a hard brush or light load towing heavy brush type, shop brush back and forth so that the whereabouts of fully dense quartz sand.