1. plastic track surface construction process: determining the scope of the Bottom Base Construction → → clean brushing waterproof elastic bottom paving material → → → → Repair detect surface material coating, spray and sprinkle colored EPDM granules crossed → → acceptance.
2. breathable plastic runway construction process:
(1) approach to determine the scope of construction, well marked.
(2) First base floor cleaning, the cleaning is finished after a period of time venue dried.
(3) the need to cement the basis for water treatment, the use of roller layer of waterproof material, waterproof material per square reference amount 0.15-0.2kg.
(4) Curing maintenance 24 hours, you can track the underlying paving waterproof timber After curing, the use of highly elastic black rubber particle size 3-4mm mixed-component high-strength glue, reference ratio of 1: 8 (glue: black particles ), stir paving, laying a thickness of about 10mm, curing and maintenance 24 hours.
(5) After the construction of the elastic layer paving, this layer detection of relevant data, to ensure the overall quality of the project.
(6) to detect problem areas repair process can be carried out only after the deal with the construction of the next process.
(7) and then use the runway paint (topcoat A material: topcoat material B = 1: 3) by adding an appropriate amount of catalyst ratio of ingredients, and then mixed with an equal amount of particle size and particle 1-2mmEPDM Stir using paint: EPDM particles = 1.2: 1, into the spraying machine gun tilted to 60 degrees with the spray, spray until maintenance is completed 24 hours, in the opposite direction once again spray (construction, the wind is relatively large does not recommend the use of such technology catalyst role: at room temperature, about 24 hours will be cured, while scattered particles and surface scraping of the surface layer of particles to be recovered and not threshing process).
(8) curing the maintenance required 48 hours (under normal weather conditions), can then be carried out in accordance with the construction site were crossed runway standard specifications.
(9) Clean, finishing the construction site after the evacuation.
(10) after the completion of all field maintenance 15 days can be put into use.
3. Note the use of plastic track
(1) plastic track at a certain drainage conditions, can be adapted to all-weather use;
(2) plastic track race only for sports training purposes, not for other purposes;
(3) Players must wear special sneakers, nail length is generally not more than 9 mm, jumping shoes are generally not more than 12 mm, if the movement has a long lace nails, you can not use on plastic runway;
(4) plastic track laying was completed maintenance needs 7-15 days before use;
(5) plastic runway edge should be protected against arbitrary tilt, if found damaged, immediately repair;
(6) on a runway closed to traffic, pile ballast and sharp things scratch;
(7) Avoid contact with organic solvents, chemicals, cigarette butts and other fire;
(8) to keep clean, you can wash with water, oil stains can be used 10% ammonia or detergent to clean the paint.